2/29/2008   Well for most of the week we have been continuing the work on trailer one. I have most of the rough pluming done and all holes in the floor have been fixed. The bath room is ready to be painted. The framing for the sink wall is done and all the pluming is done. The shower and fixtures are installed. The floor and sink and cabinet are ready to go in. The back room is all most ready to be painted and after that I will build the enclosure for the hot water tank. We took out the kitchen sink and counter top to fix the floor. The lower shelf of the kitchen sink cabinet will have to be replaced.

Back to work log home page